Alison
Transmision
8X8
TRAILER
AIR SUPLY
PUSHT
M
M
7
8
Figure 14.
53. Move vehicle forward to allow sufficient space for another bridge bay to be unloaded
next to edge of high-bank.
NOTE
If this is the last bridge bay to be launched, go to Step (50). Otherwise,
go to Step (49).
54. Repeat Steps (23) through (48).
55. Set HIGH IDLE switch (19) to ON position.
TM 9-2320-346-10
0104
0104-18