TM-9-2320-361-20

2-1/2-TON, 6x6, M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; UNIT MAINTENANCE

OCTOBER 1991

  TM-9-2320-361-20 - Page 1056 of 1207

TM 9-2320-361-20
14-32. PRIMARY HEATER AND DUCT REPLACEMENT (Contd)
d. Heater Installation
1.
2.
3.
4.
5.
6.
7.
8.
Install support (22) on van wall (13) with four screws (21).
Install exhaust tube (25) and new gasket (23) on van wall (13) with four screws (24). Install exhaust
tube (25) and new gasket (27) on support (22) with four screws (26).
Install guard (28) on van wall (13) with two screws (30). Install guard (28) on support (22) with
screw (29).
Install new O-ring (34), washer (35), and heater (16) on support (22) with two clamps (32).
Install cover (14) on heater box (31) with three screws (15).
Install adapter (17) on heater (16) with four screws (33).
Install duct (19) on adapter (17) with clamp (18).
Install heater harness (20) on heater (16).
FOLLOW-ON TASK: Check heater for proper operation (TM 9-2320-361-10).
14-51


Back to Top