12-84.
TM 9-2320-361-20
NOTE
Perform step 1 if saddle webbing was removed.
1. Install new saddle webbing (14) on cab protector (15) with adhesive.
2. Install two straps (17) on chock block holder (16) with four screws (18), new lockwashers (19), and nuts (20).
3. Install four hoses (21), two straps (22), four washers (23), screws (24), and wingnuts (25) on cab
protector (15).
WARNING
Personnel must stand clear during lifting operations. A swinging or
shifting load may cause injury to personnel.
NOTE
Assistant will help with step 4.
4. Install chain sling (12) on cab protector (15) and lifting device (13) and lift cab protector (15) onto
four tubes (11).
5. Install four upper pins (10) through cab protector (15) and four tubes (11).
FOLLOW-ON TASK: Lower derrick to stowed position (TM 9-2320-361-10).
12-135