TM 9-2320-361-34
15-30.
SIDE WINDOW SASH MAINTENANCE
THIS TASK COVERS:
a.
Removal
c. Installation
b. Inspection and Repair
INITIAL SETUP
APPLICABLE MODELS
M185A3
and M109A3
TOOLS
REFERENCES (TM)
TM 9-2320-361-10
TM 9-2320-361-34P
General mechanic’s tool kit (Appendix B, Item 1)
EQUIPMENT CONDITlON
Riveting tool (Appendix B, Item 20)
Parking brake set (TM 9-2320-361-10).
MATERIALS/PARTS
Eighteen screw-assembled lockwashers
(Appendix F, Item 162)
Tool screw-assembled lockwashers
(Appendix F, Item 163)
Rivet (Appendix F, Item 211)
Six screw-assembled lockwashers
(Appendix F, Item 164)
1. Remove lever ring (9), eighteen screw-assembled lockwashers (10), and screen (8) from sash
frames (1) and (4). Discard screw-assembled lockwashers (10).
NOTE
Pull down blackout panel from outside van body.
2.
Remove ten screw-assembled lockwashers (14), two guides (15), and blackout panel (16) from van
body wall (6). Discard screw-assembled Iockwashers (14).
3.
Remove six screw-assembled lockwashers (12) and hinge (13) horn van body wall (6). Discard screw-
assembled lockwashers (12).
4.
Remove twenty-two screws (11), sash frames (1) and (4), weatherstrip (2), and window glass (3)
from van body wall (6).
5. Drill
rivet
(5)
out
of arm (7) and remove arm (7) from sash frame (4). Discard rivet (5).
b. Inspection and Repair
Inspect screen (8), blackout panel (16), two guides (15), and window glass (3) for holes, bends, dents,
or cracks. Repair screen (8) by patching. Replace cracked window glass (3). Replace blackout
panel (16) or guide(s) (15) if bent, dented, or cracked.
c. Installation
1.
Install
arm (7) on sash frame (4) with new rivet (5).
2. Install
weatherstrip
(2) on window glass (3).
3. Install window glass (3) and sash frame (4) on sash frame (1) with twenty-two screws (11).
4. Install hinge (13) on van body wall (6) with six new screw-assembled lockwashers (12).
5. Install two guides (15) and blackout panel (16) on van body wall (6) with ten new screw-
assembled lockwashers (14).
6. Install screen (8) on sash frames (1) and (4) with eighteen new screw-assembled lockwashers (10).
7. Install lever ring (9) on arm (7).
15-112