TM-9-2320-362-14-P

TRUCK UTILITY: S250 SHELTER CARRIER, 4X4, M1037 FOR TRAFFIC JAM AN/TLQ-17A(V)3 (HMMWV)

TECHNICAL MANUAL; OPERATOR, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST FOR ELECTRICAL ENVIRONMENTAL SYSTEM (EES)

APRIL 1992

  TM-9-2320-362-14-P - Page 162 of 353

TM 9-2320-362-14&P
4-18.
EES KIT INSTALLATION (Cont' d)
28. Modify front floorboard (1) as follows:
(a)Turn front floorboard (1) over so underside is face up.
(b) Determine center of hole (3) by measuring 4 3/8 inches (11.10 cm) down
from top edge of front floorboard (3) and 2 1/2 inches (6.35 cm) from
left edge of front floorboard (1).
WARNING
When drilling, be sure to wear goggles for eye
protection or injury to personnel may occur.
(c) Using 2 1/2-inchhole saw, drill hole (3) through front floorboard (1).
(d) Mark 2 1/2 inches (6.35 cm) wide channel (2) from hole (3) to right
edge of front floorboard (1).
(c)Chisel 1/8-inch (0.30 cm) deep channel (2) from hole (3) to right
edge of front floorboard (1).
4-50


Back to Top