TM-9-2320-362-14-P

TRUCK UTILITY: S250 SHELTER CARRIER, 4X4, M1037 FOR TRAFFIC JAM AN/TLQ-17A(V)3 (HMMWV)

TECHNICAL MANUAL; OPERATOR, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST FOR ELECTRICAL ENVIRONMENTAL SYSTEM (EES)

APRIL 1992

  TM-9-2320-362-14-P - Page 155 of 353

TM 9-2320-362-14&P
4-18. EES KIT INSTALLATION (Cont’d)
7. Determine center of hole (1) on right side of transmission tunnel (3) as
follows:
(a) Measure 3 7/8-inch (9.84 cm) from rear of battery box (4), and
(b) Measure 1 5/8-inch (4.13 cm) from wall on transmission tunnel (3).
WARNING
When drilling,
be sure to wear goggles for eye
protection or injury to personnel may occur.
Avoid skin contact with paint, primer, remover,
and thinner particularly if there are cuts
or open wounds on the hand.
Failure to do so
could result in serious injury.
8.
Using 2 5/8-inch hole saw,
drill hole (1) in right side of transmission
tunnel (3).
9.
Install protector (2) in hole (1).
4-43


Back to Top