TM-9-2320-365-20-5

M1078 SERIES, 2 1/2-TON, 4 X 4, LIGHT MEDIUM TACTICAL VEHICLES (LMTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 5 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-365-20-5 - Page 311 of 666

TM 9-2320-365-20-5
Change 2
20-481
20-84.
M1078/M1081 S-280 SHELTER MODELS A, B, OR C TIEDOWN KIT
INSTALLATION/REMOVAL
This task covers:
a. Installation
b. Removal
c.
Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-365-10).
Cargo bed side panels and stakes removed (TM 9-2320-
365-10).
Tools and Special Tools
Drill Set, Twist (Item 8, Appendix C)
Drill, Portable, Electric (Item 7, Appendix C)
Tap, thread, cutting (Item 40.3, Appendix C)
Tap and Die Set, (Item 40.2, Appendix C)
Tools and Special Tools (Cont)
Tool Kit, Genl Mech (Item 44, Appendix C)
Sling, Cargo (2) (Item 31, Appendix C)
Materials/Parts
Lockwasher (8) (Item 66.2, Appendix G)
Nut, Self-Locking (4) (Item 143, Appendix G)
Personnel Required
(2)
a.
Installation.
(1)
Measure and mark a line (1) 1.25 in. (32 mm) down
from upper RH corner of tiedown bracket (2).
(2)
Measure and mark a line (3) 4.4 in. (109 mm) from
RH side of line (1).
(3)
Measure and mark a line (4) 4.72 in. (120 mm) from
RH side of line (3).
NOTE
This paragraph applies to shelter models A,
B, or C with an overall height of 83 1/2 to 89
in. (214 to 226 cm).
If shelter height is below
83 1/2 in. (214 cm), shorten cable for proper
removal of slack in turnbuckle assembly.
NOTE
Perform steps (1) through (6) on tiedowns
not originally modified.
All tiedowns are modified the same way.
RH front tiedown shown.
Measurements will be taken from upper
LH corner on LH tiedown bracket.


Back to Top