TM-9-2320-365-20-5

M1078 SERIES, 2 1/2-TON, 4 X 4, LIGHT MEDIUM TACTICAL VEHICLES (LMTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 5 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-365-20-5 - Page 315 of 666

TM 9-2320-365-20-5
Change 2
20-485
(20) Install hook (26) on upper S-280 shelter tiedown ring
(27).
(21) Install hook (28) on eyebolt (12).
(22) Perform steps (20) and (21) on remaining tiedown
cables.
(23) Remove slack from four turnbuckles (29).
(24) Tighten four turnbuckles (29) 1/2 turn in sequence
shown.
(25) Perform step (24) four more times.
(26) Raise ladder (TM 9-2320-365-10).
NOTE
Four tiedown cables are installed the same
way.
One tiedown cable shown.
Large end of S-280 shelter tiedown ring
points toward cargo bed.


Back to Top