TM 9-2320-365-20-5
Change 2
20-489
20-85.
DIGITIZATION KIT REMOVAL
This task covers:
a.
Removal
b.
Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-365-10-1)
Batteries discounted (Para 7-48)
Kick panel removed (Para 16-3)
Power distribution panel removed (Para 7-10
WTEC II, Para 7-11 WTEC III)
RH seat removed (Para 16-14)
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Materials/Parts
Lockwasher (2) (Item 103.1 Appendix G)
Washer, Spring (6) (Item 283 Appendix G)
Nut Self-Locking (6) (Item 132.1 Appendix G)
Personnel Required
(2)
a. Removal.
(1)
Remove nut (1), lockwasher (2), washer (3), and
terminal lug TL21 (4) from ground stud (5). Discard
lockwasher.
(2)
Install washer (3) and lockwasher (2) on ground
stud (5) with nut (1).
NOTE
Retain digitization kit parts for future use.
NOTE
Other terminal lugs are present at this
location.