TM 9-2320-365-20-5
Change 2
20-483
(12) Install two tiedowns (16 and 17) in four crane
pockets (15).
(13) Install four plugs (14) in cargo bed frame (18) with four
quick release pins (13).
(14) Install clamp (19) on frame rail (18) and subframe rail
(20) with spacer (21), tie-rod (22), and two self-
locking nuts (23).
(15) Perform step (14) on right clamp.
CAUTION
CAUTION
NOTE
Tiedowns are positioned with eyebolts toward
four corners of cargo bed.
Ensure quick release pins are installed
through both sides of crane pockets.
Failure
to comply may result in change to
equipment.
Ensure at least two whole threads are
showing past nuts after installation.
Failure
to comply may result in damage to
equipment.
NOTE
•
Left and right clamps are installed the same
way.
Left clamp shown.
Perform steps (14) and (15) on M1078.