TM-9-2320-366-20-4

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 4 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-366-20-4 - Page 687 of 1558

TM 9-2320-366-20-4
11-10. LOAD SENSING VALVE AND CONTROL CABLE REPLACEMENT/ADJUSTMENT
This task covers:
a. Load Sensing Valve Control Cable Removal
b. Load Sensing Valve Control Cable Installation
c. Load Sensing Valve Removal
d.
Load Sensing Valve Installation
e.
Load Sensing Valve Adjustment
f. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-366-10-1).
Air tanks drained (TM 9-2320-366-10-1).
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Goggles, Industrial (Item 15, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 58, Appendix C)
STE/ICE-R (Item 39, Appendix C)
Materials/Parts
Dispenser, Pressure Sensitive Adhesive Tape (Item 20,
Appendix D)
Materials/Parts (Cont)
Antiseize Compound (Item 58, Appendix D)
Adhesive (Item 3, Appendix D)
Tee, Pipe (Item 68.1, Appendix D)
Nut, Self-Locking (2) (Item 167, Appendix G)
References
TM 9-4910-571-12 & P
Personnel Required
(2)
WARNING
Wear appropriate eye protection when
working
under
vehicle
due
to
the
possibility of falling debris.
Failure to
comply may result in injury to personnel.
a. Load Sensing Valve Control Cable Removal.
(1) Loosen jam nut (1) on cable clamp (2).
(2) Loosen screw (3) on cable clamp (2).
(3) Remove load sensing valve control cable (4) from cable
clamp (2).
Change 1
11-57


Back to Top