TM-9-2320-366-20-4

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 4 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-366-20-4 - Page 688 of 1558

TM 9-2320-366-20-4
11-10. LOAD SENSING VALVE AND CONTROL CABLE REPLACEMENT/ADJUSTMENT
(CONT)
(4) Remove screw (5) and load sensing valve control cable
(4) from load averaging channel (6).
b. Load Sensing Valve Control Cable Installation.
WARNING
Adhesive
Sealant
MIL-S-46163
can
damage
your
eyes.
Wear
safety
goggles/glasses
when
using;
avoid
contact with eyes.
If sealant contacts
eyes, flush eyes with water and get
immediate medical attention.
Failure to
comply may result in injury to personnel.
(1) Apply adhesive to threads of screw (1).
(2) Position load sensing valve control cable (2) on load
averaging channel (3) with screw (1).
(3) Tighten screw (1) to 25-31 lb-ft (34-42 N·m).
11-58
Change 1


Back to Top