TM 9-2320-366-20-4
11-11. LOAD AVERAGING CHANNEL REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-366-10-1).
Air tanks drained (TM 9-2320-366-10-1).
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Goggles, Industrial (Item 15, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 58, Appendix C)
Materials/Parts
Adhesive (Item 4, Appendix D)
WARNING
Wear appropriate eye protection when
working
under
vehicle
due
to
the
possibility of falling debris.
Failure to
comply may result in injury to personnel.
a. Removal.
(1) Remove screw (1) and load sensing valve control cable
(2) from load averaging channel (3).
11-70