TM 9-2320-366-20-5
20-45. 200 AMP ALTERNATOR REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Batteries disconnected (para 7-57).
Alternator belts removed (para 7-3).
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Sling, Cargo (Item 31, Appendix C)
Vise, Machinist (Item 48, Appendix C)
Caps, Vise Jaw (Item 4, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 58, Appendix C)
Wrench, Torque, 0-200 lb-in. (Item 59, Appendix C)
Socket Set, Socket Wrench (Item 34, Appendix C)
Materials/Parts
Dispenser, Pressure Sensitive Adhesive Tape
(Item 20, Appendix D)
Nut, Self-Locking (Item 153, Appendix G)
Personnel Required
(2)
a. Removal.
(1) Lift dust boot (1) on terminal lug TL6 (2).
(2) Remove nut (3), lockwasher (4), washer (5), terminal
lugs TL6 (2) TL2 (6) and fuse link (7) from alternator
terminal (8).
(3) Position fuse link (7), washer (5), lockwasher (4), and nut
(3) on alternator terminal (8).
(4) Lift dust boot (9) on terminal lug TL60 (10).
(5) Remove nut (11), lockwasher (12), washer (13), and
terminal lug TL60 (10) from alternator terminal (14).
(6) Position washer (13), lockwasher (12) and nut (11) on
alternator terminal (14).
20-262
Change 1