TM 9-2320-366-20-5
17-12. M1089 HOIST CABLE REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
MHC erected over tool box (TM 9-2320-366-10-2).
Hook block assembly removed (para 17-4).
Hoist cable fully payed out (TM 9-2320-366-10-2).
Engine shut down (TM 9-2320-366-10-1).
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Gloves, Welder’s (Item 14, Appendix C)
Personnel Required
(2)
WARNING
Cable can become frayed or contain broken
wires.
Wear heavy leather-palmed gloves
when handling cable.
Frayed or broken
wires can injure hands.
Failure to comply
may result in injury to personnel.
a. Removal.
(1) Drive cable wedge (1) and cable (2) out of sleeve (3).
(2) Pull cable (2) from sleeve (3).
(3) Remove cable (2) from drum (4).
b. Installation.
(1) Route cable (1) over and around drum (2).
(2) Insert cable (1) through slot (3) in side of drum (2).
(3) Route cable (1) up through sleeve (4) and back down
into sleeve, making a loop.
17-43