Change 1
2-1072.11
TM 9-2320-366-34-1
OPERATIONAL TEST
(1) Attempt to lower dump body
(TM 9-2320-366-10-1).
(2) If dump body does not lower, replace dump
body hoist cylinder (para 17-4).
(3) If dump body does lower, fault corrected.
PRESSURE TEST
(1) Perform pressure reducing valve adjustment
(para 17-3).
(2) If pressure reducing valve cannot be adjusted
to 325-375 PSI, clean or replace presuure
reducing valve (para 17-3).