TM 9-2320-366-34-1
Change 2
2-1072.1
Test continued from page 2-1071.
CAUTION
NOTE
NOTE
In the event of a tachometer failure, a
HAND THROTTLE lever positioned to full
down is approximately 750 RPM.
(13) Set engine speed to idle 750 RPM
(TM 9-2320-366-10-1).
(14) Position PTO switch to off
(TM 9-2320-366-10-1).
(15) Shut down engine (TM 9-2320-366-10-1).
NOTE
(10) If pressure is not 2,825-2,875 PSI
(19,478-19,822 kPa), loosen lock nut on
adjusting screw on four-way relief valve.
Turn adjusting screw counter clockwise to
lower pressure, clockwise to raise
pressure.
(11) If pressure cannot be adjusted, clean or
replace four-way relief valve (para 17-3).
Hold adjusting screw on four-way relief
valve while tightening lock nut.
(12) Tighten locking nut on adjusting screw.
NOTE
Test continued at top of page.
Hydraulic oil temperature must be
145°F-155°F (63°C-68°C) prior to
performing troubleshooting checks.
Failure to comply may result in
inaccurate test results.
Holding DUMP BED UP/DOWN switch
in the UP position will force hydraulic
oil through relief valve and cause oil
temperature to rise.
Measure hydraulic oil temperature near
bottom of hydraulic reservoir.
(7) Attach a temperature indicator sticker to
hydraulic oil tank.
(8) Press and hold DUMP BED UP/DOWN
switch in the UP position
(TM 9-2320-366-10-1) until hydraulic oil
temperature reaches 145°F-155°F
(63°C-68°C).
(9) Perform STE/ICE Test #51 (TM 9-4910-
571-12&P)
Note location of adjusting screw on
four-way relief valve before performing
step (10).
PRESSURE TEST (CONT)
PRESSURE TEST (CONT)