TM-9-2320-366-34-2

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE; VOLUME NO. 2 OF 4

AUGUST 2005
CHANGE 2

  TM-9-2320-366-34-2 - Page 990 of 1434

TM 9-2320-366-34-2
13-330
Change 2
13-32.
M1088 FRAME RAIL REPLACEMENT (CONT)
(9)
Install Power Takeoff (PTO) cable assembly
(TM 9-2320-366-20-4).
(10) Install 15K Self-Recovery Winch (SRW) hoses
(TM 9-2320-366-20-5).
(11) Install 15K Self-Recovery Winch (SRW) control
valve and brackets (TM 9-2320-366-20-5).
(12) Install alternator ground strap (TM 9-2320-366-20-3).
(13) Install cab to chassis ground strap (TM 9-2320-
366-20-3).
(14) Install start and charging cable assembly (TM 9-
2320-366-20-4).
(15) Install radiator brackets (para 13-45).
(16) Install ramps (para 13-41).
(17) Install frame muffler support bracket (para 13-44).
(18) Install frame plate (para 13-22).
(19) Install rear bumper (para 13-9).
(20) Install rear crossmember (para 13-7).
(21) Install rear axle shock absorber brackets
(para 14-9).
(22) Install intermediate axle shock absorber
brackets (para 14-8).
(23) Install engine and transmission oil sampling
valves (TM 9-2320-366-20-3).
(24) Install transmission resilient mount and bracket
(para 7-6).
(25) Install suspension air cylinder (para 17-2).
(26) Install air spring and bracket (TM 9-2320-366-20-4).
(27) Install battery box (TM 9-2320-366-20-3).


Back to Top