TM 9-2320-366-34-2
13-332
Change 2
13-33.
M1083 SUBFRAME RAIL REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Cargo bed removed (para 15-9).
Fuel tank removed (TM 9-2320-366-20-3).
Tool box removed (TM 9-2320-366-20-4).
Hydraulic manifold removed (TM 9-2320-366-20-5).
Hydraulic reservoir removed, if equipped (TM 9-
2320-366-20-5).
Transmission auxiliary oil cooler removed (TM 9-
2320-366-20-4).
Tools and Special Tools
Tool Kit, Genl Mech (Item 78, Appendix B)
Goggles, Industrial (Item 28, Appendix B)
Wrench, Torque, 0-600 lb-ft (Item 97, Appendix B)
Socket Set, Impact (Item 58, Appendix B)
Wrench, Impact, Electric (Item 88, Appendix B)
Wrench Set, Socket (Item 84, Appendix B)
Materials/Parts
Nut, Self-locking (17) (Item 211, Appendix F)
Bolt (17) (Item 7, Appendix F)
Personnel
(3)
a. Removal.
(1)
Remove two collars (1) and bolts (2) from front
lifting bracket (3).
Discard collars and bolts.
WARNING
CAUTION
Wear appropriate eye protection when
working under vehicle due to the
possibility of falling debris.
Failure to
comply may result in injury to personnel.
When removing bolts, continuous removal of
collars is mandatory.
Failure to comply may
result in seizing of collar to bolt.
NOTE
•
Left and right side subframe rails are
removed the same way.
Right side
shown.
•
Steps (1) through (4) require the aid of
an assistant.