TM 9-2320-366-34-3
16-582.2
Change 2
16-93.
POWER TAKE-OFF (PTO) REPLACEMENT/REPAIR (CONT)
e. Installation.
(1) Install four threaded studs (1) in PTO (2).
(1.1)
Apply sealing compound to threads of 90-degree
fittings (3 and 4) and tee fitting (4.1).
(1.2)
Install preformed packing (5) on 90-degree fitting
(3).
(1.3)
Position 90-degree fitting (3) in PTO (2).
(1.4)
Install tee fitting (4.1) in PTO (2).
(1.5)
Install tube (5.1) on 90-degree fitting (3).
(1.6)
Install tube (5.1) on tee fitting (4.1).
(1.7)
Install preformed packing (6) on 90-degree fitting
(4).
(1.8)
Position 90-degree fitting (4) in transmission (7).
(1.9)
Tighten 90-degree fittings (3 and 4) to 10-13 lb-ft
(14-18 N•M).
(1.10) Position gasket (8) and PTO (2) on transmission (7)
with eight screws (9).
(1.11) Tighten eight screws (9) to 42-50 lb-ft (57-68 N•m).
WARNING
NOTE
Perform steps (1) through (1.11) on PTO P/N
12378814-001.
Adhesive
Sealant
MIL-S-46163
can
damage your eyes.
Wear safety
goggles/glasses when using; avoid
contact with eyes.
If sealant contacts
eyes, flush with water and get immediate
medical attention.
Failure to comply may
result in injury to personnel.
NOTE
•
Step (1.10) requires the aid of an assistant.
•
Apply spindle compound to input gear prior
to installation.