TM-9-2320-387-24-2

TRUCK, UTILITY: S250 SHELTER CARRIER, 4X4, M1113

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE, VOLUME 2

DECEMBER 1997
CHANGE 1

  TM-9-2320-387-24-2 - Page 317 of 1555

11-53. TURRET DOOR REPLACEMENT
This task covers:
a. Removal
b. Installation
INITIAL SETUP:
Applicable Models
M1114
Tools
General mechanic’s tool kit:
automotive (Appendix B, Item 1)
Maintenance and repair shop equipment:
automotive (Appendix B, Item 2)
Personnel Required
One mechanic
One assistant
Manual References
TM 9-2320-387-10
TM 9-2320-387-24P
Equipment Condition
Turret backrest removed (para. 11-54).
Maintenance Level
Unit
TM 9-2320-387-24-2
11-104
Change 1
1.
Open turret hatch door (3) flat against turret (6).
2.
Remove four nuts (7), washers (8), and capscrews (1) from turret door (3) and turret (6).
3.
Remove nut (5), washer (4), and capscrew (2) from turret door (3) and turret (6).
4.
Remove turret door (3) from turret (6).
1.
Position turret door (3) on turret (6) and secure with capscrew (2), washer (4), and nut (5). Tighten
capscrew (2) to 37 lb-ft (50 N
m).
2.
Install four capscrews (1), washers (8), and nuts (7) on turret door (3) and turret (6). Tighten cap-
screws (1) to 37 lb-ft (50 N
m).
b. Installation
a. Removal


Back to Top