TM-9-2320-387-24-2

TRUCK, UTILITY: S250 SHELTER CARRIER, 4X4, M1113

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE, VOLUME 2

DECEMBER 1997
CHANGE 1

  TM-9-2320-387-24-2 - Page 75 of 1555

TM 9-2320-387-24-2
Change 1
10-59
10-33. TUNNEL INTERIOR SIDE INSULATION REPLACEMENT
This task covers:
a. Removal
b. Installation
NOTE
Replacement procedures for all tunnel interior side insulation are
basically the same. This procedure covers the left front insulation.
1.
Remove six screws (3), retainer rods (1), (2), (4), and insulation (6) from tunnel (5).
NOTE
Perform step 2 for M1114 models and step 3 for M1113 models.
2.
Remove two screws (8) and washers (7) from insulation (6) and tunnel (5).
3.
Remove four screws (9), two angle brackets (10), and insulation (6) from floor (11).
NOTE
Perform step 1 for M1113 models and step 2 for M1114 models.
1.
Install insulation (6) and two angle brackets (10) on floor (11) with four screws (9).
2.
Install insulation (6) on tunnel (5) with two washers (7) and screws (8).
3.
Install insulation (6) and retainer rods (1), (2), and (4) on tunnel (5) with six screws (3).
b. Installation
a. Removal
INITIAL SETUP:
Tools
General mechanic’s tool kit:
automotive (Appendix B, Item 1)
Manual References
TM 9-2320-387-24P
Equipment Condition
• Left front cowl insulation removed (para. 10-31).
• Gunner’s platform removed (M1114 only)
(para. 11-71).
• Rifle support removed (M1114 only) (para. 11-66).
Maintenance Level
Unit
FOLLOW-ON TASKS: • Install left front cowl insulation (para. 10-31).
• Install gunner’s platform (M1114 only) (para. 11-71).
• Install rifle support (M1114 only) (para. 11-66).


Back to Top