TM-9-2320-387-24-2

TRUCK, UTILITY: S250 SHELTER CARRIER, 4X4, M1113

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE, VOLUME 2

DECEMBER 1997
CHANGE 1

  TM-9-2320-387-24-2 - Page 962 of 1555

FOLLOW-ON TASKS: • Charge A/C system (para. 25-15).
• Install A/C coolant line covers (para.25-32).
• Install air horn-to-air cleaner elbow (dryer-to-heater/evaporator assembly only)
(para. 3-15).
TM 9-2320-387-24-2
Change 1
25-83
25-31. A/C PRESSURE HOSES MAINTENANCE (Cont'd)
1
8
10
11
9
27
14
29
1
10
28
29
28
13
19
27
14
12
10
13
14
9
14
1
16
17
2
3
6
7
5
4
9
~
~
21
20
22
1
23
13
26
25
24
~
~
~
13
10
1
2
3
18
19
9
~
5
6
15
10
9


Back to Top