TM-9-2320-387-24-2

TRUCK, UTILITY: S250 SHELTER CARRIER, 4X4, M1113

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE, VOLUME 2

DECEMBER 1997
CHANGE 1

  TM-9-2320-387-24-2 - Page 998 of 1555

TM
9-2320-387-24-Z
26-3.
9,000
LB WINCH
REPAIR
This task covers:
a. Disassembly
b. Cleaning
c. Inspection
d. Assembly
I
INITIAL SETUP:
Tools
%eral
mechanic’s tool kit:
automotive (Appendix B, Item 1)
Materials/Parts
Gasket (Appendix G, Item 78)
‘Iwo gaskets (Appendix
G,
Item 79)
Lockwasher (Appendix
G,
Item 207)
Coating compound (Appendix
C,
Item 23)
Lubricating oil (Appendix
C,
Item 42)
AircraR grease (Appendix
C,
Item 32)
Anaerobic pipe sealing compound
(Appendix C, Item 62)
Manual References
TM 9-2320-387-24P
Equipment Condition
l
winch removed (Ml1131 (para. 12-27).
l
Winch removed (Ml1141 (para. 12-33).
l
Winch cable removed (para. 12-28).
Maintenance Level
Direct support
a. Disassembly
NOTE
Tag leads for assembly.
1.
Remove three screws (11, ground lead (31, and motor control cover (2) from control pack (4).
26-2


Back to Top