TM 9-2320-387-24-2
Change 1
25-113
25-35. A/C WIRING HARNESS AND CABLE MAINTENANCE (Cont’d)
FOLLOW-ON TASKS: • Install A/C coolant line covers (para. 25-32).
• Install air horn-to-air cleaner elbow (para. 3-15).
• Install access hole cover plate (para. 25-36).
• Install condenser fan access panel (para. 11-86).
• Install heater/evaporator assembly cover (para. 25-21).
• Install A/C front air distribution duct (para. 11-81).
11
2
12
6
13
14
10
~
1
15
2
9
4
2
5
6
7
8
~
~