JACK OUTRIGGERS - Continued
•
Operate left and right outrigger jack (LH O/R JACK and RH O/R
JACK) control levers at the same time.
•
Crane movement from one lever may be slower than the other when
operating two levers together.
1.
Simultaneously move LH O/R JACK (1) and RH O/R JACK (2) control levers to DOWN
position.