TM-9-2320-431-10-1

TRUCK, WRECKER, 8X8, M984A1

TECHNICAL MANUAL; OPERATOR'S MANUAL; PART 1 OF 2

JUNE 2009

  TM-9-2320-431-10-1 - Page 1041 of 1244

SHUT DOWN CRANE - Continued
4
18
11
13
14
16
15
17
3
10
Figure 23.
NOTE
Operate BOOM and HOIST control levers at the same time.
Crane movement from one lever may be slower than the other when
operating two levers together.
9.
Move BOOM control lever (10) to DOWN position until boom rests on mast pad (17)
and move HOIST control lever (3) to UP position to remove slack from cable (4).
STOW OUTRIGGERS
1.
Remove two retaining pins (1) from each outrigger pad (2).
TM 9-2320-431-10-1
0106
0106-25


Back to Top