TM-9-2320-431-10-1

TRUCK, WRECKER, 8X8, M984A1

TECHNICAL MANUAL; OPERATOR'S MANUAL; PART 1 OF 2

JUNE 2009

  TM-9-2320-431-10-1 - Page 1039 of 1244

SHUT DOWN CRANE - Continued
Do not let cable unwind and become slack or cable may get tangled
on drum.
Crane should be stowed using remote control to allow operator
visibility during stowing or damage to equipment may result.
NOTE
Operate control levers with light, even pressure.
TELESCOPE and HOIST control levers should be operated at same
time.
Crane movement from one lever may be slower than the other when
operating two levers together.
1.
Move TELESCOPE control lever (1) to IN position to pull boom extensions (2) in and
move HOIST control lever (3) to UP position to reel in cable (4) until boom extensions
(2) are fully retracted.
1
5
8
6
2
11
4
7
9
12
10
3
Figure 22.
2.
Operate SWING control lever (5) to position boom (6) parallel with outrigger beam (7)
on driver side of vehicle.
3.
Move MAST control lever (8) to DOWN position to lower mast (9) until mast is
completely folded down.
TM 9-2320-431-10-1
0106
0106-23


Back to Top