Table 1.
PMCS - WEEKLY - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
•
Crane movement from
one lever may be slower
than the other when
operating two levers
together.
(3) Move TELESCOPE
control lever to OUT
position to extend boom
while moving hoist
control lever to DOWN
position to pay out cable.
Extensions
do not come
out.
CABLE
FIRST
STAGE
THIRD
STAGE
SECOND
STAGE
TELESCOPE
CONTROL LEVER
HOIST
CONTROL LEVER
Figure 38.
(4) Check first, second, and
third stages of boom for
broken welds or obvious
damage.
There are
broken
welds or ob-
vious dam-
TM 9-2320-431-10-2
0185
0185-56