TM-9-2320-431-10-2

TRUCK, WRECKER, 8X8, M984A1

TECHNICAL MANUAL; OPERATOR'S MANUAL; PART 2 OF 2

JUNE 2009

  TM-9-2320-431-10-2 - Page 494 of 712

Table 1.
PMCS - WEEKLY - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
HOIST
CONTROL LEVER
CABLE
Figure 41.
(10)Move HOIST control
lever to DOWN position
to pay out cable.
Cable does
not pay out.
NOTE
For more information on ma-
terial handling crane remote-
control operating instructions,
refer to grove crane operation
(remote- control) procedures.
(Volume 1, WP 0107)
4. Check crane remote control
levers as follows:
a. Set up REMOTE CONTROL
UNIT passenger side.
TM 9-2320-431-10-2
0185
0185-60


Back to Top