Table 1.
PMCS - WEEKLY - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
35
Weekly
Retrieval
System
1. Check lift cylinder and hoses,
driver side and passenger side
tow cylinders and hoses,
crosstube, and control valves for
leaks and obvious damage.
Any Class
III leaks are
found.
GRAB HOOKS
TOW CYLINDERS
CROSSTUBE
LIFT CYLINDER
CONTROL
VALVES
SUPPORT ASSEMBLY
Figure 46.
NOTE
When properly installed, cot-
ter pins should be toward out-
side of vehicle.
2. Check grab hooks for damaged
or missing cotter pins.
TM 9-2320-431-10-2
0185
0185-69