TM-9-2320-431-10-2

TRUCK, WRECKER, 8X8, M984A1

TECHNICAL MANUAL; OPERATOR'S MANUAL; PART 2 OF 2

JUNE 2009

  TM-9-2320-431-10-2 - Page 499 of 712

Table 1.
PMCS - WEEKLY - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
BOOM control lever to
DOWN position to lower
boom to horizontal
position.
does not
lower.
CAUTION
Keep hook block at least
one ft. (30 cm) from end
of boom. If hook block hits
end of boom it may
damage cable or hook
block and crane will lose
power. Wait six seconds
for power and check
crane for damage.
Do not let cable become
slack or cable may get
tangled on drum.
NOTE
TELESCOPE and HOIST
levers should be
operated at the same
time.
Crane movement from
one lever may be slower
than the other when
operating two levers
together.
(5) Move TELESCOPE
control lever to OUT
position, while moving
HOIST control lever to
Extensions
will not
come out or
cable will
not pay out.
TM 9-2320-431-10-2
0185
0185-65


Back to Top