OPERATION - Continued
WARNING
Check ground conditions for firmness and extreme sideways inclination
prior to picking up or off-loading a flatrack or container. Any ground
instability beneath road wheels may result in injury or death to personnel.
WARNING
Check for overhead power lines or other obstructions prior to attempting
LHS operation. LHS reaches a height of 22 ft. 2 in. (6.7 m). Failure to
comply may result in injury or death to personnel.
CAUTION
Ensure rail transport locking pins are disengaged before unloading
flatrack. Rail transport locking pins are used for rail transport only. Failure
to comply may result in damage to equipment.
6.
Set PTO ENGAGE switch (5) to ON position. Indicator light (6) will illuminate.
TM 9-2320-434-10
0067
0067-4