OPERATION - Continued
WARNING
Ensure trailer air system is pressurized prior to beginning transfer or
flatrack locks may not properly engage/disengage. Failure to comply may
result in injury or death to personnel.
4.
Push in knob (5) and retract flatrack locks (6).
5.
Set PTO ENGAGE switch (7) to ON position. Indicator light (8) will illuminate.
CAUTION
•
Engine speed must be at idle before using hydraulic selector switch,
or damage to equipment may result.
•
Load must be evenly distributed on flatrack pallet. Uneven load
distribution may cause LHS OVER LOAD indicator to give false
signals and cause LHS to operate incorrectly.
NOTE
The amount of time to load and unload is controlled by engine speed.
Engine speed may be increased to approximately 1,500 rpm to reduce
loading and unloading times.
6.
Turn hydraulic selector switch (9) to MAN H.A.
WARNING
Check for overhead power lines or other obstructions prior to attempting
LHS operation. LHS reaches a height of 22 ft. 2 in. (6.7 m). Failure to
comply may result in injury or death to personnel.
TM 9-2320-434-10
0068
0068-4