TM 9-2320-440-13&P
0146-4
0146
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4.
Install air line 2102A (8) on elbow (9).
NOTE
Install washers as noted prior to removal.
5.
Lubricate threads of screw (4) with lubricating oil and install height control link (5) on height control valve (6)
with screw (4), washer (3), washer (2), and locknut (1). Tighten locknut (1) to 4 to 5 lb-ft (5.4 to 6.8 N•m).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Start engine and build up air pressure (
2.
Check air lines and fittings for leaks.
3.
Shut off engine (
4.
Remove wheel chocks (
END OF TASK
END OF WORK PACKAGE
THAAD0308