TM-9-2320-440-13-P

TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) CARRIER

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2010

  TM-9-2320-440-13-P - Page 1060 of 1616

TM 9-2320-440-13&P
0144-4
0144
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
8.
Remove three fittings (3) and preformed packings (16) from stabilizer cylinder (8). Discard preformed
packings.
9.
Remove coupling (17) and preformed packing (18) from stabilizer cylinder (8). Discard preformed packing.
10. Remove dust cap (19) from coupling (17).
END OF TASK
INSTALLATION
1.
Install dust cap (19) on coupling (17).
2.
Lightly lubricate preformed packing (18) with clean oil and install preformed packing (18) and coupling (17) on
stabilizer cylinder (8).
3.
Lightly lubricate three preformed packings (16) with clean oil and install preformed packings (16) and
fittings (3) on stabilizer cylinder (8).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
THAAD0113


Back to Top