TM-9-2320-440-13-P

TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) CARRIER

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2010

  TM-9-2320-440-13-P - Page 1055 of 1616

TM 9-2320-440-13&P
0143-15
0143
22. Repeat step (19) to install front plate.
23. Install extension cylinder (17) to outer beam (8) with four washers (16) and screws (15).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
24. Install bulkhead fitting (6) on outer beam (8) with nut (14).
25. Install bulkhead fitting (3) on outer beam (8) with nut (13).
26. Lightly lubricate preformed packing (12) with clean oil and install preformed packing (12) and hose (11) on
bulkhead fitting (6).
THAAD0096
THAAD0095


Back to Top