TM-9-2320-440-13-P

TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) CARRIER

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2010

  TM-9-2320-440-13-P - Page 1056 of 1616

TM 9-2320-440-13&P
0143-16
0143
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
27. Lightly lubricate preformed packing (10) with clean oil and install preformed packing (10) and hose (9) on
bulkhead fitting (3).
28. Install tube assembly (7) on outer beam (8).
29. Lightly lubricate preformed packing (5) with clean oil and install preformed packing (5) and tube (4) on
bulkhead fitting (6).
30. Lightly lubricate preformed packing (2) with clean oil and install preformed packing (2) and tube (1) on
bulkhead fitting (3).
31. Repeat steps (9) through (28) to install right side outrigger components.
END OF TASK
FOLLOW-0N MAINTENANCE
1.
Install outrigger stabilizer cylinders (WP 0144).
2.
Retract outriggers (WP 0013).
3.
Remove wheel chocks (
END OF TASK
END OF WORK PACKAGE
TM 9-2320-347-10)


Back to Top