TM 9-2320-440-13&P
0149-3
0149
3.
Soldier A supports equalizing beam (7) while Soldier B removes locknut (8), screw (9), two washers (10),
bushings (11), spacers (12), and equalizing beam (7) from axle bracket (13). Discard locknut.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4.
Soldier A and Soldier B remove locknut (14), screw (15), two spacers (16), and equalizing beam (7) from
frame bracket (17) and vehicle. Discard locknut.
END OF TASK
INSTALLATION
WARNING
Equalizing beam is heavy (Aprox. 145 lbs). Do not lift equalizing beam without the aid of Soldier B.
Failure to comply may result in injury to personnel.
NOTE
All equalizing beams are installed the same way. No. 4 axle, left side shown.
1.
Lubricate threads of screw (15) with lubricating oil.
2.
Soldier A and Soldier B install equalizing beam (7) on frame bracket (17) with two spacers (16), screw (15),
and locknut (14).
Tighten locknut (14) to 600 lb-ft (814 N•m).
3.
Lubricate threads of screw (9) with lubricating oil.
4.
Coat two bushings (11) with rust preventive.
NOTE
Position flat side of bushings toward axle.
5.
Soldier A supports equalizing beam (7) while Soldier B installs equalizing beam (7) on axle bracket (13) with
two spacers (12), bushings (11), washers (10), screw (9), and locknut (8). Tighten locknut (8) to 445 to 495 lb-
ft (603 to 671 N•m)
THAAD0394