TM-9-2320-440-13-P

TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) CARRIER

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2010

  TM-9-2320-440-13-P - Page 602 of 1616

TM 9-2320-440-13&P
0070-2
0070
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NOTE
Tag and mark wires and connectors prior to removal to ensure proper installation.
Remove cable ties as required.
2.
Remove wire 1435 (4), wire 1474 (5), and wire 1466 (6) from terminal strip (7).
3.
Remove collar (8), washer (9), sealing ring (10), and cable (11) from junction box (3).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4.
Remove wire 1435 (12), wire 1469 (13), and wire 1461 (14) from terminal strip (7).
5.
Remove collar (15), washer (16), sealing ring (17), and cable (18) from junction box (3).
THAAD0402
THAAD0403


Back to Top