TM 9-2320-440-13&P
0094-3/(4 blank)
0094
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3.
Soldier A and Soldier B install generator mounting bracket (9) and battery box bracket (12) on frame rail (5)
with four screws (11) and locknuts (10).
4.
Install bracket (8) on generator mounting bracket (9) with two screws (7) and locknuts (6).
5.
Soldier A and Soldier B install generator mounting bracket (4) and battery box bracket (3) on frame rail (5)
with four screws (2) and locknuts (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install air reservoirs No. 1 and No. 3 (WP 0054).
2.
Install auxiliary battery box (Refer to THAAD Launcher IETM).
3.
Install amber reflector TM 9-2320-325-14&P.
4.
Install marker/clearance light (WP 0071).
5.
Install generator platform (WP 0098).
END OF TASK
END OF WORK PACKAGE
THAAD0078