TM-9-2320-440-13-P

TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) CARRIER

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2010

  TM-9-2320-440-13-P - Page 722 of 1616

TM 9-2320-440-13&P
0095-2
0095
REMOVAL
WARNING
The THAAD hydraulic system operates at oil pressure up to 3,250 psi (22,409 kPa).
Never disconnect any hydraulic line or fitting without first dropping pressure to
zero. Failure to comply may result in serious injury or death to personnel.
NOTE
Note position of tees prior to removal to ensure proper installation.
Position drain pan under hydraulic lines and fittings being removed.
Tag and mark hydraulic lines prior to removal to ensure proper installation.
Cap and plug hydraulic lines upon removal.
Remove cable ties as required.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1.
Remove two hoses (1) and preformed packings (2) from tee (3). Discard preformed packings.
2.
Remove two hoses (4) and preformed packings (5) from tee (6). Discard preformed packings.
THAAD0604


Back to Top