TM-9-2320-440-13-P

TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) CARRIER

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2010

  TM-9-2320-440-13-P - Page 780 of 1616

TM 9-2320-440-13&P
0102-4
0102
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
6.
Install control valve bracket (4) on fender bracket (5) with two screws (3), washers (2), and locknuts (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install distribution manifold (WP 0126).
2.
Install data plates (WP 0096).
3.
Install work lamp switch (WP 0090).
4.
Install palm switch (WP 0073).
5.
Install lamp check switch (WP 0067).
6.
Install rack lock/air bag indicator lights (WP 0081).
7.
Install auxiliary work lamp (WP 0058).
END OF TASK
END OF WORK PACKAGE
THAAD0120


Back to Top