TM-9-2320-440-13-P

TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) CARRIER

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2010

  TM-9-2320-440-13-P - Page 938 of 1616

TM 9-2320-440-13&P
0130-4
0130
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
11. Loosen two screws (16) and remove connectors (17) and gaskets (18) from solenoid valve coils (19). Discard
gaskets.
12. Remove two fittings (9 and 10) and preformed packings (20 and 21) from hook arm manifold (14). Discard
preformed packings.
END OF TASK
INSTALLATION
NOTE
Both hook arm manifolds are installed the same way. Right side shown.
Install cable ties as required.
1.
Lightly lubricate two preformed packings (20 and 21) with clean oil and install preformed packings (20 and 21)
and fittings (9 and 10) on hook arm manifold (14).
2.
Install two gaskets (18) and connectors (17) on solenoid valve coils (19) and tighten screws (16).
WARNING
Adhesives, solvents, and sealing compounds can burn easily, can give off harmful
vapors, and are harmful to skin and clothing.
To avoid injury or death, keep away
from open fire and use in a well-ventilated area.
If adhesive, solvent, or sealing
compound gets on skin or clothing, wash immediately with soap and water.
3.
Apply adhesive on head of two screws (16).
THAAD0235


Back to Top