TM-9-2330-238-14

CHASSIS, SEMITRAILER: 6-TON, 4-WHEEL M295A1; SEMITRAILER, VAN: EXPANSIBLE, 6-TON, 4-WHEEL M313; SEMITRAILER, VAN: SHOP, FOLDING SIDES, 6-TON, 4-WHEEL M447 AND M447C; SEMITRAILER, VAN: REPAIR PARTS, SHOP EQUIPMENT, 6-TON, 4-WHEEL M749; SEMITRAILER, VAN: REPAIR PARTS STORAGE, 6-TON, 4-WHEEL M750

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL

JULY 1992

  TM-9-2330-238-14 - Page 313 of 462

TM 9-2330-238-14
5-6. AXLE AND BRACKET ASSEMBLY REPLACEMENT (Con’t).
CAUTION
Rubber-mounted torque rod ball ends allow torque rods to be moved out of normal
alinement for installation. Use caution to prevent damage to threads on ball ends.
4.
Install four lower torque rods (1) in each end of axle and bracket assembly (12) and four lower torque rod
brackets (13) by working torque rod ball ends (11) into mounting holes and tapping with a soft-faced hammer.
Front and rear axles (7) may be raised or lowered as required to aid in installation.
5.
Install eight new Iockwashers (10) and nuts (9) on torque rod ball ends (11). Torque nuts to 225-280 Ib.-ft.
(305-380 N-m),
6.
Remove jackstands from under front and rear axles (7) and lower until weight of axles is supported by lower
torque rods (1).
7.
Install hydraulic lines (6) to connection on bases (8) of tandem axle (para 4-42).
FOLLOW-ON TASKS:
Install springs (para 4-56).
Ž
Install wheels (para 4-49).
TA702063
5-11


Back to Top