TM-9-2330-326-14-P

SEMITRAILER, TACTICAL, DROP DECK BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, M871A3

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

FEBRUARY 2006

  TM-9-2330-326-14-P - Page 135 of 540

TM 9-2330-326-14&P
6-59
6-20. RETRACTABLE TWIST LOCKS REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Tasks
d. Service (Monthly)
Initial Setup:
Tools and Special Tools:
Materials:
Tool kit, general mechanic’s (Item 4, Appendix B-3)
Oil, lubricating (Item 9, Appendix F)
Equipment Conditions:
References:
Landing legs down
Appendix C
Semitrailer disconnected from prime mover
Paragraph 6-1
Tires chocked
TM 9-237
Ground boards emplaced
TB 9-2510-242-10
CAUTION
Insure lock pockets are clean and all debris removed.
NOTE
§
Make sure twistlock pocket is clean and free of debris.
§
Item 3, socket (cup) is welded in. This task is accomplished at
Direct Support.
§
There are eight retractable twist locks and they are removed
and
installed
the
same way.
This
procedure
covers
one
retractable twist lock.
§
See Paragraph 6-1 for additional service requirements.
General Procedure:
a. Removal.
Remove pin (5), handle with twistlock (2). Discard pin.
b. Installation.
Install handle with twistlock (2 and new pin (5).


Back to Top