TM-9-2330-326-14-P

SEMITRAILER, TACTICAL, DROP DECK BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, M871A3

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

FEBRUARY 2006

  TM-9-2330-326-14-P - Page 137 of 540

TM 9-2330-326-14&P
6-61
6-21. TIEDOWN RINGS REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Tasks
Initial Setup:
Tools and Special Tools:
Materials:
Tool kit, general mechanic’s (Item 4, Appendix B-3)
Oil, lubricating (Item 9, Appendix F)
Equipment Conditions:
References:
Landing legs down
Appendix C
Semitrailer disconnected from prime mover
Paragraph 6-1
Tires chocked
Ground boards emplaced
CAUTION
Replace damaged/deformed D-Rings.
NOTE
There are 4 ammunition and 36 cargo tiedown rings and they
are removed and installed the same way. This procedure covers
one tiedown ring.
See Paragraph 6-1 for additional service requirements.
General Procedure:
a.
Removal.
Remove cotter key, nut, bolt, sleeve, upper ring, and lower ring.
b. Installation.
NOTE
Hand tighten nut against D-ring. Make sure D-ring does not bind.
Install lower ring into deck pinning, upper ring, sleeve, bolt, nut, and cotter key.


Back to Top