TM-9-2330-326-14-P

SEMITRAILER, TACTICAL, DROP DECK BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, M871A3

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

FEBRUARY 2006

  TM-9-2330-326-14-P - Page 146 of 540

TM 9-2330-326-14&P
6-70
b. Installation.
1.
Install ground board (6) onto semitrailer and install clip (4) and chain link (5).
2.
Install two new cotter pins (1), washers (2), and one pin (3) to semitrailer bracket.
c.
Follow-On Tasks.
1.
Secure ground board (6) using clip (4) to take up slack in chain. Pull on handle to insure ground
board will not slide out during operation.
2.
Connect semitrailer to prime mover.
3.
Remove tire chocks.
4.
Raise landing legs.


Back to Top