TM-9-2330-326-14-P

SEMITRAILER, TACTICAL, DROP DECK BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, M871A3

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

FEBRUARY 2006

  TM-9-2330-326-14-P - Page 147 of 540

TM 9-2330-326-14&P
6-71
6-25. BULKHEAD AND STOWAGE RACK ASSEMBLY REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Tasks
Initial Setup:
Tools and Special Tools:
Tool kit, general mechanic’s (Item 4, Appendix B-3)
Equipment Conditions:
Landing legs down
Semitrailer disconnected from prime mover
Sideboards/stakes removed from bulkhead and stowage racks
Tires chocked
Ground boards emplaced
General Procedure:
a. Removal.
WARNING
Bulkhead assembly weights 250 pounds.
CAUTION
Retaining strap must be wrapped around stowage
rack and panels then tightened/secured. Do not
attach strap ends to deck cargo rings. This will
cause the strap to prematurely wear and break,
resulting in loss of panels during operation.
1.
Remove two locknuts (11), two bolts (1), four locknuts (10), four washers (9), four bolts (8), and
curbside and roadside stowage assemblies (7). Discard locknuts.
2.
Remove eight nuts (6), eight lockwashers (5), eight bolts (4) and crossmember bulkhead assembly
(3). Discard lockwashers.
3.
Remove four nuts (12), four lockwashers (13), four bolts (14), and bulkhead assembly (2). Discard
lockwashers.


Back to Top