TM-9-2330-326-14-P

SEMITRAILER, TACTICAL, DROP DECK BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, M871A3

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

FEBRUARY 2006

  TM-9-2330-326-14-P - Page 155 of 540

TM 9-2330-326-14&P
6-79
6-28. FLOOR DECK BOARDS REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Tasks
Initial Setup:
Tools and Special Tools:
References:
Tool kit, general mechanic’s (Item 4, Appendix B-3)
Appendix H-4
Equipment Conditions:
Landing legs down
Semitrailer disconnected from prime mover
Tires chocked
Ground boards emplaced
NOTE
For
detailed
procedures
and/or
instructions
see
referenced “H” Section.
Deck screws must be ordered separately, they are not
part of a kit.
General Procedure:
a. Removal.
1.
Remove flat head screws (9) from 6-5/8” wide floor board (1) and remove floor board (1) from
semitrailer.
2.
Remove flat head screws (9) from 7” wide floor board (2) and remove floor board (2) from
semitrailer.
3.
Remove flat head screws (9) from 3-5/8” wide floor board (3) and remove floor board (3) from
semitrailer.
4.
Remove flat head screws (9) from 7” wide floor board (4) and remove floor board (4) from
semitrailer.
5.
Remove flat head screws (9) from 7” wide floor board (5) and remove floor board (5) from
semitrailer.
6.
Remove flat head screws (9) from 7” wide floor board (6) and remove floor board (6) from
semitrailer.
7.
Remove flat head screws (9) from 7” wide floor board (7) and remove floor board (7) from
semitrailer.
8.
Remove flat head screws (9) from 7” wide floor board (8) and remove floor board (8) from
semitrailer.
9.
Remove flat head screws (9) from 6-5/8” wide floor board (10) and remove floor board (10) from
semitrailer.


Back to Top